Composite Geomembrane Construction Precautions*It should be used in an embedded manner, and the covering check here thickness should not be less than 30cm*The entire anti-seepage system should have: The responsibility lies with the base layer, anti-seepage layer, transition layer and protective layer*The soil should be solid to avoid uneven se